Europe
Speed and documentation
- Typical lead time
- 2–5 weeks for standard cross-sections; rarer types and long runs are made to order.
Every line arrives with the document the committee asks for.
The line where the paperwork goes wrong most often. Few people realise that cables are construction products under the CPR and need a DoP with a declared reaction-to-fire class — and the committee asks for it.
If your item is not on the list, send it anyway — the list is a guide, not a limit.
The standard in the BoQ decides what can and cannot be delivered.
We check which standard is written into the contract documents and confirm in writing that what we propose meets it. Where the written requirement does not exist on the market in that form, we say so before ordering, not after delivery.
A missing document is declared missing.
The documents arrive with the goods, organised line by line. We do not go looking for them once the committee asks.
Indicative. A binding deadline is given only in a written quote.
Speed and documentation
Price and volume