Europe
Speed and documentation
- Typical lead time
- 2–5 weeks. On large renovation packages the limiting factor is usually the plant's production capacity, not the transport.
Every line arrives with the document the committee asks for.
On energy-efficiency and renovation works the document weighs as much as the material. The declared lambda value and the reaction-to-fire class are what the committee checks against the design.
If your item is not on the list, send it anyway — the list is a guide, not a limit.
The standard in the BoQ decides what can and cannot be delivered.
We check which standard is written into the contract documents and confirm in writing that what we propose meets it. Where the written requirement does not exist on the market in that form, we say so before ordering, not after delivery.
A missing document is declared missing.
The documents arrive with the goods, organised line by line. We do not go looking for them once the committee asks.
Indicative. A binding deadline is given only in a written quote.
Speed and documentation
Price and volume